Drone captures work on the Design Build project for Ken Mitchell Lakes Cell 1 Diversion

Design/Build project for the City of Brighton’s Ken Mitchell Lakes Cell 1 diversion to repair three pump stations damaged during flooding in 2015. Limit disruption to the stream, riparian zone, and the site in general.

Drone captures work on the new river bank locations.

snapshot-1-11-9-2016-12-35-pm

 

Click on link to see video:

dji00094