Allen WTF UV Disinfection Improvements

$4,067,298 Owner: City of Englewood Engineer: CDM Smith Schedule: 10/23/2012 - 10/31/2013

Installation of a new below-grade UV disinfection facility and pipe gallery.  Construction includes flow bypass system, caissons, chemical feed systems, sampling pumps, above-grade masonry building, pre-engineer wall enclosures and various site improvements.  Major components of the plant’s electrical switch gear are also being upgraded.  Work involves closely coordinating with plant operators to minimize the effects of construction on the daily operations of the plant.