Denver Water Marston Moffat TP Chemical Feed & Solids Handling

$5,118,966 Owner: Denver Water Engineer: Denver Water Schedule: 06/04/2019 - 05/05/2020

Work to be performed at Denver Water Marston and Moffat sites include the install of Distribution Conveyor, modifications to chemical application points and the sodium hydroxide system including demolition and peristaltic metering pumps.