Granby Hydroelectric Plant

$2,205,456 Owner: Northern Water Hydropower Water Engineer: CH2MHill Schedule: 04/01/2015 - 06/15/2016

Construction of a powerhouse consisting of concrete foundations and a metal building to house two 600 KW turbine generators. Value engineering methods were used to keep construction costs within the $2.2 million budget.