Meridian Chloramine Conversion

$4,098,479 Owner: Meridian Meropolitan District Engineer: Jacobs Engineering Schedule: 01/27/2021 - 09/27/2021

Construct new chemical storage and feed facilities at Booster Pump Station 1 and 2. The new structures will connect to the existing Booster Pump Station structures. Install electrical and HVAC equipment, controls, instrumentation, analyzers, control cabinets, indoor lighting, conduits and wiring including instruments and analyzers.